About the Project

Learn about the concept behind Corallis Apartments.

A lakeside residential concept

Corallis Apartments was conceived as a modern residential park combining urban comfort with a nature-oriented lifestyle. Located on the shores of Lake Grivița, the site was carefully selected to offer residents an exceptional quality of life.

Sustainability and environmental awareness guided every stage of the design. Corallis is envisioned as a community that lives in harmony with its surroundings while enjoying the benefits of modern technology.

Excellent location
Excellent location

Corallis Apartments is located on the shores of Lake Grivița, just 15 minutes from the city center. The residential park's immediate surroundings offer numerous services and recreational opportunities.

  • Excellent transportation
    Public transport hub 5 minutes walk, highway connection 3 minutes away.
  • Services nearby
    Shopping center, restaurants, cafes and schools within a 10-minute radius.
  • Recreational opportunities
    Lakeside promenade, running track, bike path and sports fields directly next to the residential park.

Living the Corallis lifestyle

Spaces designed for balance, activity, and connection.

Conscious living
Promoting responsible choices through thoughtful design and sustainable solutions.
Empowerment
Encouraging an active, independent lifestyle connected to nature and community.
Well-being
Creating spaces that support physical, mental, and emotional balance.
Corallis
Architectural concept

Modern design meets natural harmony.

The architectural concept blends clean, modern lines with natural materials. Apartment layouts are designed for maximum comfort and space efficiency, with large windows offering panoramic views of the lake and surrounding greenery.

The name Corallis is inspired by coral structures – natural, organic, and sustainable – reflecting our goal to create a unique and harmonious living environment.

Construction updates

  • March 2026

    The structural works of all the buildings in the complex have been successfully completed. The execution of the facades is currently underway.

  • February 2026

    Structural works continued on the 5th floor for buildings A,B and C and the form work of the top floor began in B. Finishing and installation works continued in buildings D and E.